Restaurant at Dudley Port, Sandwell
A new two storey restaurant at the corner of Dudley Port and Fisher Street in Sandwell. We are acting as Architects and Structural Engineers for this commercial development. Our work included applying for planning permission for a new restaurant and then preparing the building regulation submission along with the structural design.

Construction would soon start on site with the anticipated completion in Autumn 2010.

Contract Sum: £1.0M


Greets Green Access Centre, West Bromwich
We carried out a feasibility study to analyze the existing facilities of the Yemeni Community Association and outline the need to expand the facilities. We then prepared Planning Application for a new storey on top of the existing single storey building and internal layout changes. We are in the process of submitting the Building Regulations application which includes carrying out the Site Investigation, the Structural Sesign of the building and the foundations as well as Architectural details for compliance with Building Regulations.

The construction would start in the middle of 2010.

Contract Sum: £0.5M


Halfords Lane Mosque, Smethwick
The projects involves the demolition of one of the existing buildings occupied by the Bangladeshi Community Welfare community and extension to the existing mosque with a new storey on top and minarets at each corner of the building. We provided Architectural and Structural engineering services. We first prepared the planning application for the scheme which. We have also prepared the building regulation submission which includes preparing detailed drawings and carrying out structural design.

Contract Sum: £1.0M


Pargat House, Birmingham
The brief from Pargat Housewares was to design a single storey storage warehouse in Birmingham with a floor area of about 1150m2. The minimum clearance height of 9m imposed by the client had an impact on the design of the warehouse. A single storey portal frame building design was chosen as the final design solution as it was the most suitable choice bearing in mind the column free space required as given in the brief. The span of the portal frames was 27m while the height was 10m at Apex.

We provided Architectural services including obtaining planning permission and building regulations approval. We also provided Structural Engineering services which included design of steel superstructure and pilled foundations as it was on fill material.

Contract Sum: £500,000


Granville Court, Birmingham
It is a city centre development in Birmingham consisting of a mixture of 80 single-bed and double bed apartments. The building is a five storey steel framed building with In-Situ concrete ground floor and PC floor units for the upper floors. The building also has an underground car parking facility. We are providing Architectural, Project Management and Consultant Engineering services to Euro Property Construction Limited.

The construction is still underway.

Contract Sum: £6.5M


Prouds Lane, Wolverhampton
A residential development of 9 new apartments in Wolverhampton. We provided full architect and structural engineering services. This included applying for planning permission for this development and then preparing the building regulation submission which included the structural design of the building and the foundations. We were also involved with the construction phase and provided Architect's warrantee certificates upon completion.

Contract Sum: £1.8M


Lion Farm Estate, Rowley Regis
The area was renowned for being a rough area with a high crime rate. The 3 acre site had 6 storey flats with lock up garages which gave a combination of low social standing and crime within the area. On behalf of Image Homes we undertook the design and project management for the 47 houses, 2 new roads and sewer network, the modification of the existing road network and a new sub-station.

The whole development has had a dramatic impact upon the area and it has been noticed by other residents who have commented that the development has considerably raised the standards of the area.

Contract Sum: £4.5M